Project full name:
BUILDING PROCESS CONTROL AND AUTOMATION SYSTEM FOR NEWLY-BUILT TEXTILE FACTORY "DEVOLD"
Client:UAB "PST"
Period:2014/11 – 2015/08
Solutions:Building management systems (BMS); Building automation systems;
Project description:During the project, a building process control and automation system was implemented in a newly-built textile factory “Devold” in Panevėžys. Object parameters: 16.000 sq.m. total area, 245 work places.
Automated systems in the building:
- Air supply, recirculation and removal;
- Control of natural gas accounting and concentration;
- Fire fighting;
- Lightning control and power accounting;
- Level control of oil products and grease;
- Control of smoke removal;
- Management of fire valves.
Implemented integrated control:
- Thermal point;
- Boiler-house;
- Compressors;
- Cooling systems;
- Systems of uninterruptible power supply (UPS).