Project full name:
GAS CHROMATOGRAPHS, INSTALLATION DESIGN AND MOUNTING SERVICES
Client:AB „Amber Grid“
Period:2016/08 – 2016/12
Solutions:Gas-main pipeline supervisory control and data acquisition systems (projects in Lithuania);
Project description:During the implementation of the agreement “Chromatographs, Design Services for their Installation, Mounting and Start and Adjustment Operations”, Elsis TS provided the following services:
- Delivery of natural gas chromatographs (4 sets) designated to determine the composition of natural gas by on-line mode and to calculate the higher and the lower calorific value, density, relative density, and Wobbe index,
- Preparation of projects for the installation of this equipment, conducting its testing, mounting and launching;
- Execution of all required construction and designing of any other structures and engineering communications, construction and mounting activities which were required to ensure proper functioning of the aforementioned equipment;
Provision of trainings for the staff so as to make it able to operate the equipment.